I had a couple of wet days over New Years so decided to actually do another section of the build.
As you can see, there was a fair amount in it.
The mostly completed box two is fairly substantial and once ready, drops over the top of the box one build. 8-10 pins are pushed into place to lock the two parts together.
The “finished” product of the first two boxes.