Box 2


I had a couple of wet days over New Years so decided to actually do another section of the build.

Box 2

Box 2

As you can see, there was a fair amount in it.

Box 2 contents

Box 2 contents

 

 

 

 

 

 

 

 

 

 

The mostly completed box two is fairly substantial and once ready, drops over the top of the box one build.  8-10 pins are pushed into place to lock the two parts together.

Assembled second box on the right beside the previously completed box 1.

Assembled second box on the right beside the previously completed box 1.

Another view of the two sections side by side.

Another view of the two sections side by side.

Second part drops over the top of the first part and pins are pushed in place to lock it together.

Second part drops over the top of the first part and pins are pushed in place to lock it together.

 

 

 

 

 

 

 

 

 

 

 

 

 

Seats fitted

Seats fitted

The “finished” product of the first two boxes.

First two boxes completed

First two boxes completed

First two boxes completed

First two boxes completed